At YourQS we are constantly working to improve our systems and processes with the aim of providing a more accurate estimate and a better service.
Often you can’t see these changes, you just receive the benefit, but this time with the update to our reports are visual.
The improvements are:
- New Trade Summary – has a $/m2 per trade, shows any quotes included
- Larger 3D model views – model view is easier to see
- Automated schedules and notes – reflects exactly what is in the model
- New cost control view – for your job cost management system
- Improved navigation – hyperlinks to get around the PDF
These changes make it easier to understand what we have measured and how we have costed your project and make it easier to interact with our reports. By making things more visible, they also improve our accuracy.
Trade Summary
We have tweaked the summary of costs by trade section:

We often receive quotes or input from our customers, so we now have a column to show these verses the costs we have estimated. The bottom row shows what % of the job is quoted or our estimate.
We have added a cost per m2 column. While we don’t use this approach to estimate any costs, (it is just not very accurate) it does provide for a good means to cross check estimates between jobs.
The area we use for this is shown in the On-site overheads section. For new builds it is the floor area, for renovations it is the affected floor area – the floor area where work is being done.
If you have provided us with a quote, we now show the quote reference on the item in the trade detail section.
Automated Costing
Amazing as it sounds, 98% of our costing is done by our QSs clicking one button. That button triggers our servers to run algorithms over the 3D model that produces the costing you see in just a few minutes.
This process requires two main inputs, the geometry of the 3D element and element metadata which is information attached to the element that tells the system how the element is built. Checking both aspects is vital for an accurate estimate and we want to communicate this to you as well so these next two improvements help with that.

Our team creates these views as they are modelling the project by taking a screenshot of the model showing the elements included in the selected scope. Our software now automatically deletes the screenshot if the user adds or removes an element to ensure that the picture matches the costing.
Automated Schedules and Notes
The change that was technically very hard to achieve is the element schedules and notes, previously our team manually created the notes which meant that they had to remember to do it, and if we changed any details, remember to update them. Now the system automatically builds these tables from the model.
For windows, doors, and zones (i.e. rooms or spaces), we provide two tables.
- Types – which gives the details for common settings across each type and the total area of each type
- Instances – a schedule for each instance and their specific settings

General elements are listed by each element type with the area and main settings for the elements shown.

It would be too much to show you all the settings for each element so aim at the main ones.
NB: We know these tables aren’t yet perfect, we’ll keep working on them. This is the nature of software development; you’d never release anything if you try to get it perfect first.
Cost Control View
We have been working with job cost management systems to determine the best way of enabling you to use our estimates to manage your job costs. We developed the Work Area then Scope structure of our reports with the aim of communicating what we have included in the take-off (and for you to communicate to your clients) but we realise that when it comes to managing the job, you need the information in a different format.
To facilitate this, we have developed the cost control view. This is the same information as the rest of the report, just grouped by Phase (when it happens) and Cost Centre (what is happening). The cost centres are based on the CBI coding system used by most architects in their specifications.
We show you the hours, labour cost, and values for materials, subcontractors, and other for each phase/cost centre. Our research shows that this is an appropriate level to manage your timesheets and costs at, not so low you are bogged down in the detail, but low enough that you can identify if a cost centre is blowing out and then be able to drill down on it.
We can make this information available as an electronic file so you can import this into most job cost management systems. Please email us if you’d like this.

Improved Navigation
Our PDF reports contain hyperlinks to help you navigate, when the cursor turns to a hand, click and it will jump you to that part of the report.

At the top of each page are links to take you back the contents (right side) or back to the start of the section you are in (left side).

The reports also contain bookmarks that show the report structure and let you jump between them. To show them, press CNTL-B in most PDF viewers.

Labour Breakdown
To stop the report being too big, we removed the labour breakdown section from the detail report. It is still available so if you would like to see it, just ask. What it provides is a detailed breakdown of the carpentry labour showing our time estimates for every activity.